10/16/2024
The new contractor’s timeline will allow residents on Cordry to have until December 1st to remove their watercraft from the lake (if they choose). The contractor DOES NOT plan to lower the level of the lake. Construction will start on the downslope side of the dam as early as the week of October 28th. The contractor plans to leave the road open as long as possible. We will pass along details and updates as we receive them. Thank you for being so cooperative through this project.